Land systems procurement in Europe: the largest recapitalisation in forty years

Land systems procurement in Europe is the capability area where the gap between contracted value and advertised value is widest. Armoured vehicle programmes are typically contracted through OCCAR, through intergovernmental partnerships, or by negotiated procedure. Several of the largest European land programmes of the last decade never generated a single public tender, and the ones that did were advertised long after the supplier list had closed.

Every one of them is nonetheless authorised, approved and funded in dated public decisions that run twelve to thirty-six months ahead of the contract. Dfensio flagged each programme below inside that period, before the tier-2 nomenclature was fixed.

European land programmes: values, stages and expected contract windows

Values are as published by the contracting authority or the prime. Where a programme value is classified or unpublished, the table says so.

ProgrammeCountryValueStageFlagged by Dfensio (date)Expected contract window
Boxer RCT30 / SPz Schakal, 291 vehiclesGermany and NetherlandsContract value not disclosed; 2025 budget line EUR 1,108.96 mOption exercised, contract live2023-08-02Tier-2 lots 2026-2029
CV90 infantry fighting vehicleNetherlandsEUR 1 bn to EUR 2.5 bnPre-contract, supplier named, no competition2025-12-192026
Abrams Stage I Phase 2 and Stage II, 216 tanks plus 76 derivativesRomaniaUSD 458.20 m plus EUR 6,488.34 mParliamentary approval granted, not yet contracted2025-09-30Open now
VAC tracked support vehicle, 394 units in 10 versionsSpainEUR 788 m pre-financing within a EUR 1,291 m packageContractor named, pre-financing granted2025-10-16Legal contract deadline 2026-10-31
Borsuk infantry fighting vehiclePolandPLN 6.57 bn gross for 111; framework about 1,400 vehiclesSerial delivery, further executive contracts prepared2025-03-272026-2027
CaMo: 382 Griffon and 60 JaguarBelgiumEUR 1,575 mIn delivery, Belgian final assembly running2018-11-07Assembly and support work 2025-2031
AICS heavy armoured vehicle family, 1,050 vehiclesItalyAbout EUR 16 bn over 14 yearsApproved, funding tables to 20362022-09-15Rolling tranches to 2036
Armoured Cavalry (Ajax)United KingdomGBP 6,979 m whole-life costRecovery, vehicle acceptance restarted2026-07-14Ministerial review completing autumn 2026
Leopard 2 A8 NOR main battle tanksNorwayNot disclosedAcquisition running through Forsvarsmateriell2026-09-02Support and industrial packages

Germany and the Netherlands: the Boxer RCT30 chain and the CV90 decision

Germany and the Netherlands procured 222 vehicles, 150 and 72 respectively, under a contract announced on 13 November 2025 [2]. On 7 August 2026 OCCAR exercised the option for a further 69 vehicles, 35 German and 34 Dutch [1]. The prime is ARTEC, the joint venture of KNDS Deutschland and Rheinmetall, and the German federal budget funds the programme at EUR 1,108,955,000 for 2025 [4]. Dfensio flagged the programme in August 2023, twenty-six months before the contract, and flagged the option exercise six days before the parliamentary sitting that authorised it [3].

The Dutch CV90 acquisition is at an earlier and more open stage. It is placed between EUR 1 billion and EUR 2.5 billion, with Sweden as lead nation and BAE Systems Haegglunds named as supplier, and it will proceed without competition [5]. Subsystem sourcing remains genuinely open until the acquisition moves to its final parliamentary stage, expected in 2026.

Romania, Poland and Spain: three different routes to the same tier-2 opening

Romania's Abrams programme is the largest uncontracted land opportunity in Europe. The ministry published the figures in full on 30 September 2025 and the joint parliamentary bureaux granted approval on 12 November 2025 [7][8]. The values are USD 458.20 million for Stage I Phase 2 and EUR 6,488.34 million for Stage II, covering 216 tanks and 76 derivatives, with a binding requirement that the tanks and their subsystems be produced and maintained in Romania. That clause is the tier-2 opening: Romania named no domestic suppliers on Stage I, and the domestic base for Stage II has yet to be built.

Poland routes its land programmes through framework agreements followed by executive contracts, spreading the opportunity over years. The Borsuk framework of 28 February 2023 covers roughly 1,400 vehicles; the first executive contract of 27 March 2025 covers 111 vehicles at about PLN 6.57 billion gross to a consortium of Polska Grupa Zbrojeniowa and Huta Stalowa Wola [9][10]. Roughly 1,290 vehicles remain to be placed, and each further executive contract is a fresh sourcing event.

Spain has published the shape of its tier-2 base itself. Real Decreto 914/2025 of 16 October 2025 grants EUR 788 million of pre-financing to a named contractor, TESS Defence, for 394 VAC vehicles in ten versions, sets a legal contract deadline of 31 October 2026, and quantifies the industrial base at more than 400 national suppliers with roughly 90 per cent nationalisation across four named industrial corridors [11].

Belgium, Italy, the United Kingdom and Norway

Belgium's CaMo partnership with France, signed on 7 November 2018 for 382 Griffon and 60 Jaguar vehicles at EUR 1,575 million, has never been advertised: it is a government-to-government purchase. On 15 July 2025 Belgian Defence confirmed that Mol Cy, in Staden, performs final assembly, equipment fitting, testing and finishing of more than 380 Griffon vehicles over 2025 to 2030-31 [6]. The opening for Belgian and French suppliers is in that assembly and support chain, not in any tender.

Italy's heavy armoured vehicle family, roughly EUR 16 billion over fourteen years for 1,050 vehicles, received parliamentary approval on 15 September 2022, with funding allocated across 2022-2028 and 2029-2036 [12]. The tranches roll out to 2036.

The United Kingdom offers a different kind of opportunity: a programme in recovery. The ministerial statement of 14 July 2026 on the Armoured Cavalry programme records sixteen vehicles accepted, trials restarted, 41 recommendations from an independent expert panel, and a further ministerial review completing in the autumn [13]. A programme that slips or re-scopes changes its residual requirement, and with it the supplier list. Norway, meanwhile, is acquiring Leopard 2 A8 NOR main battle tanks through Forsvarsmateriell [14].

What Dfensio flagged

  • Boxer RCT30 / Schakal, 222 vehicles plus 69 on option for Germany and the Netherlands: flagged August 2023, twenty-six months before the contract of 13 November 2025; the option exercise was flagged six days before its parliamentary authorisation in June 2026 [1][2][3][4].
  • Romanian Abrams Stage I: flagged 18 May 2023, seven months before the letter of offer and acceptance of 15 December 2023. Stage I Phase 2 and Stage II, USD 458.20 million and EUR 6,488.34 million: flagged 30 September 2025, six weeks before parliamentary approval, and still uncontracted [7][8].
  • Spanish VAC, 394 vehicles, EUR 788 million pre-financing: flagged 16 October 2025, twelve months before the legal contract deadline of 31 October 2026 [11].
  • Dutch CV90, EUR 1 billion to EUR 2.5 billion: flagged 19 December 2025, ahead of the final parliamentary stage in 2026 [5].
  • Italian heavy armoured family, about EUR 16 billion: flagged 15 September 2022, with tranches running to 2036 [12].

What land systems suppliers should do next

Three dated windows are open. The Romanian Abrams Stage II remains uncontracted after parliamentary approval on 12 November 2025, with a binding local production and maintenance requirement and no Romanian tier-2 base yet named [7][8]. The Spanish VAC programme carries a legal contract deadline of 31 October 2026 and a published intention to source from more than 400 national suppliers [11]. The Dutch CV90 acquisition has a named supplier and no competition, which makes the next six months the last period in which subsystem sourcing is genuinely open [5].

In each case the counterparty is the prime or the national armament agency, approached against the named programme rather than a tender category, and before the design review closes the nomenclature. In land systems the public tender is a lagging indicator, and in several major programmes it never arrives at all.

Frequently asked questions

Which European armoured vehicle programmes are still open to new suppliers?

Romania's Abrams Stage II is approved but not contracted and carries a binding requirement for production and maintenance in Romania. Spain's VAC programme must be contracted by 31 October 2026 and is explicitly built on a national supplier base of more than 400 firms. The Dutch CV90 acquisition has a named supplier but open subsystem sourcing. Poland's Borsuk framework has roughly 1,290 vehicles still to be placed under further executive contracts.

What is the Romanian Abrams programme worth, and what does it require locally?

USD 458.20 million for Stage I Phase 2 and EUR 6,488.34 million for Stage II, covering 216 tanks and 76 derivatives, approved by the joint parliamentary bureaux on 12 November 2025. The approval carries a binding requirement that the tanks and their subsystems be produced and maintained in Romania, and no domestic suppliers were named on Stage I.

How much of the Boxer RCT30 programme remains open to tier-2 suppliers?

The programme now stands at 291 vehicles, 222 under the base contract of 13 November 2025 and 69 under the option exercised on 7 August 2026, with ARTEC as prime. Tier-2 lots are expected to be placed through 2026-2029 as production ramps, and the German federal budget funds the programme at EUR 1,108.96 million for 2025.

What does Spain's VAC programme offer national suppliers?

EUR 788 million of pre-financing to TESS Defence for 394 tracked support vehicles in ten versions, within a EUR 1,291 million package, with a legal contract deadline of 31 October 2026. The decree quantifies the industrial base at more than 400 national suppliers with roughly 90 per cent nationalisation across four industrial corridors.

Is the Belgian CaMo programme still an opportunity?

Yes, in its assembly and support chain. The EUR 1,575 million partnership with France covers 382 Griffon and 60 Jaguar vehicles, and Belgian Defence confirmed on 15 July 2025 that Mol Cy in Staden performs final assembly, equipment fitting, testing and finishing of more than 380 Griffon over 2025 to 2030-31. The programme has never been advertised and will not be.

Official sources

  1. Additional 69 BOXER RCT30 wheeled infantry fighting vehicles for Germany and the Netherlands. KNDS Group, 2026-08-07
  2. Germany and the Netherlands procure 222 BOXER RCT30 wheeled infantry fighting vehicles. KNDS Group, 2025-11-13
  3. Tagesordnung, 41. Sitzung des Haushaltsausschusses (Optionsausloesung Schuetzenpanzer Schakal). Deutscher Bundestag, 2026-06-18
  4. Einzelplan 14, Regierungsentwurf Bundeshaushalt 2024. Bundesministerium der Finanzen, 2023-08-02
  5. A/B-brief Verwerving infanteriegevechtsvoertuig CV90 (Kamerstuk 27 830 nr. 476). Tweede Kamer der Staten-Generaal, 2025-12-19
  6. Les premiers vehicules Griffon belges deviennent realite. La Defense (Belgian Defence), 2025-07-15
  7. Comunicat nr. 263, MApN continua demersurile (Tanc principal de lupta, etapa I faza 2 si etapa II). Ministerul Apararii Nationale (Romania), 2025-09-30
  8. Sedinta Birourilor permanente reunite, decizie de aprobare prealabila. Camera Deputatilor (Romania), 2025-11-12
  9. Bojowy woz piechoty BORSUK, programme page. Ministerstwo Obrony Narodowej (Poland)
  10. Nowe bojowe wozy piechoty Borsuk zakontraktowane, 111 egzemplarzy. Ministerstwo Obrony Narodowej (Poland), 2025-03-27
  11. Real Decreto 914/2025 (BOE-A-2025-20693), VAC, TESS Defence. Agencia Estatal Boletin Oficial del Estado, 2025-10-16
  12. Atto del Governo n. 430, schema di decreto SMD 27/2022, rinnovamento famiglia sistemi d'arma componente pesante. Camera dei Deputati (Italy), 2022-09-15
  13. Written Ministerial Statement HCWS237, The Armoured Cavalry Programme. UK Parliament, 2026-07-14
  14. Anskaffelse av nye stridsvogner (Leopard 2 A8 NOR). Forsvarsmateriell (Norway)

Dfensio's analysts are available to answer questions on any programme mentioned in this article. Request a confidential briefing at dfensio.com/contact.